There are no results by your search word! "lurem"

Please try with a different search term.

You didn't find your wanted machine? send wanted inquiry to all dealers
Category: 1103 turbines
Latest update: 11.05.2026
approved
dealer
item-No.: 114091
New in: 2002

used

Location: Land-de

Turbine Turbine mileage: 30,000 hours Counter-pressure turbine Manufacturer KKK Initial commissioning in 2002 Type: CFR5 G6a Power Max: 2500 kW Operating power: 2200 kW, Speed 23000 rpm, Fresh steam pressure: 65 bar, Fresh steam pressure temperature: 480 C, Evaporation pressure: 1-17 bar, Investments in 2002, Total steam forming station renewed from 63 bar to 2.5 bar in 2002, El. Generator Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA renewed, Complete measuring, control, control technology of the turbine renewed, steam turbine renewed With Energy Installed boiler power Boiler I Coal Steam generation: 20 t/h, 63 bar, 495 C Boiler II Coal Steam generation: 13 t/h, 34 bar, 425 C Boiler III: Combined burner for oil and gas, steam generation: 20 t/h, 17 bar, 285 C General overhaul of the entire plant from 2002 to 2004, steam generator renewed, automatic charcoal and  ...

Category: 1103 turbines
Latest update: 11.05.2026
approved
dealer
item-No.: 114094

used

Location: Land-de
VS

Turbine Operating Hours of Turbine: 30.000h Back-pressure turbine Manufacturer: Fa. KKK First Start-up: 2002 Type: CFR5 G6a Power Max: 2500 kW Operational efficiency: 2200 kW, Revolution number: 23000 U /min, Live steam pressure: 65 bar, Live steam pressure temperature: 480 °C, Evaporation pressure: 1-17 bar, Investments in the year 2002 , Entire steam transforming station from 63 bar to 2,5 bar in the year 2002 renewed, El. Generator Fa. Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA, renewed, Entire measuring -, governing and control of the turbine renewed, Steam turbine renewed with Energy Production Installed boiler efficiency: Boiler I , Hard coal, Steam generation: 20 t/h, 63 bar, 495 °C Boiler II , Hard coalr Steam generation: 13 t/h, 34 bar, 425 °C Boiler III: , Combination burner for oil and gas, Steam generation: 20 t/h, 17 bar, 285 °C General overha ...

Category: 1107 other energy machinery
Latest update: 11.05.2026
approved
dealer
item-No.: 665490
New in: 2002

used

Location: Land-de

Back-pressure turbine Manufacturer: Fa. KKK First Start-up: 2002 Operating Hours of Turbine: 30,000h Type: CFR5 G6a Power Max: 2500 kW Operational efficiency: 2200 kW Revolution number: 23000 rpm Live steam pressure: 65 bar Live steam pressure temperature: 480 oC Evaporation pressure: 1-17 bar Investments in the year 2002 Entire steam transforming station from 63 bar to 2.5 bar renewed in 2002, El. Generator Leroy Somer, el. Power 2 MW Renewed measuring Entire -, governing and control of the turbine renewed Steam turbine renewed Installed boiler efficiency: Boiler I Hard coal Steam generation: 20 t/h, 63 bar, 495 oC Boiler II Hard coal Steam generation: 13 t/h, 34 bar, 425 oC Boiler III: Combination burner for oil and gas Steam generation: 20 t/h, 17 bar, 285 oC General overhaul of the entire plant from 2002 to 2004 Steam generator renewed automatic cole-loader ...

Category: 704 fruits, vegetables, delicatessen, instant-meals machines
Latest update: 06.05.2026
item-No.: 158346364
New in: 1994

used

Location: Land-de
Price: VB 15.000 €

Binding press, completely made of stainless steel (frame & all rollers) Bandwidth 1450mm, L x W x H: 4450 x 2100 x 2450mm. Processing capacity with apples approx. 4-6 t/h. Year of construction 1994 Other fruits, berries and vegetables are also possible. No compressed air needed! No complex control necessary! Belt tension by means of 2 pcs. 5t. crank winches and 2 steel springs Very little trub in the juice because no shear effect of 2 bands! Rotary brush & 2 rotary high-pressure nozzles for belt cleaning. This press is an improved replica of an (Amos Compact cover press, see Prospeckt from Amos) in contrast to the Amos press, all rollers in our press are completely made of stainless steel and with continuous shaft (not only shaft stumps) as well as in the interior again amplifier discs to significantly increase the stability of the rollers. The rollers lurk on plain bearings t ...

Category: 1103 turbines
Latest update: 11.05.2026
approved
dealer
item-No.: 161275419

used

Location: Land-de

Turbine Turbine operating hours: 30,000h Backpressure turbine Manufacturer: Kkk First start-up: 2002 Type: CFR5 G6a Power max: 2500 kW Operating efficiency: 2200 kW, Number of revolutions: 23000 rpm, Live steam pressure: 65 bar, Live steam pressure temperature: 480 C, Evaporation pressure: 1-17 bar, Investments in 2002 , Entire steam transformation station renewed from 63 bar to 2.5 bar in 2002, El. Generator Fa. Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA, renewed, complete measurement, control and control of the turbine renewed, steam turbine renewed with energy production General overhaul of the entire plant from 2002 to 2004, steam generator renewed, automatic corder and ash removal system renewed, water treatment plant renewed, complete instrumentation renewed, flue gas cleaning plant Lurgie renewed from 1991 - 2001 Mistakes excepted!

You didn't find your wanted machine? send wanted inquiry to all dealers (no registration necessary)
Banner ad information