We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
new
We are pleased to present our complete commercial and technical offer for an unused 2 × 750 MW Combined Cycle Gas Turbine (CCGT) Power Plant, based on GE Frame 9FA technology, supplied, installed, but not commissioned. The plant equipment is available as a complete package, including major equipment, auxiliaries, and Balance of Plant (BOP). 1. Plant Configuration Overview Total Configuration: • 2 × GE Frame 9FA Gas Turbines • 2 × CMI Triple Pressure HRSG • 1 × GE Steam Turbine • Combined Cycle Output: ~750 MW per block Status: • Installed / partially installed • Not commissioned • Units have never been fired or operated 2. Gas Turbine Island Gas Turbines • Quantity: 2 Units • Manufacturer: GE • Model: Frame 9FA +e DLN2+ • Fuel: Dual Fuel • Frequency: 50 Hz • Site Rated Output: 241,000 kW per unit • Year of Manufacture / De ...
used
Good shaped and well maintained 360MW gas fired GE PG9271E CCGT for sales. Year of built 2005, commissioned in 2006, and converted from HFO fuel in the beginning to gas fuel in 2014-15. Shutdown in 2020. Power plant was under power until 2024. Runnong hour : 32000 hrs
used
GE Model : LM6000PA Power Output : 42 MWe ISO condition Voltage : 11KV Frequency : 50Hz Total 2 nos.
used
Turbogas Turbine GE5/1 5MW Natural gas for sale. Complete turbogas turbine plant with electric generator, recovery boiler and exchangers, dry cooler, diverter. Total Hours: 36,000 8,000 hours from the last overhaul. THERMAL POWER 9,0 MWt Saturated steam production 13,000 kg/h at 10BARg Voltage 11000 V Frequency 50 hZ Also available: - GE5/1 used turbine in nitrogen storage with 72,000 hours + 8,000 Hours after the last overhaul + one used generator Price: €240,000. - NEW GE5 Turbine Spare Parts (value 1 million) Price : €320,000. Available for sale from Gas Engine Exchange . Please check our complete range of equipment at gasengineexchange.
used
Complete 96 MWe gas fired black start/ peak load power station, consisting of 4 (four) GE Frame 5N Gas Turbine Sets 24 MW each. Each set consists of a: • Gasturbine • Generator • Diesel Engine • Main Gearbox • Auxiliary Gearbox • Speedtronic Mark II control system • Exhaust plenum • Air inlet filter house Dismantled With or without building. additional info on request.
used
used
The combined cycle plant consists of a gas turbine, waste heat recovery boiler, steamturbine and a generator, mounted in a single shaft configuration. The capacity of the installation is 53 MW • The prime mover of the installation is an aero derivative General Electric LM6000-PB-DLE. 40 MW - 30,000 hours remaining till next major overhaul - Running hours 74.100 hours , start 3356 - Next overhaul in 5000 hours(hot gas path) - Next major overhaul: in 30.000 hours • The Steam Turbine is a SIEMENS ENK40/53-3, with a capacity of 13 MWe. Dismantled, stored and ready for transport.
new
GE Fuel Oil Filter PN: WE021222 Drawing Number: 84A220402P9 4 units
used
GE mobile X-ray machine VMX • Before taking over, all devices or systems have been tested on site for their functionality. • The system is located in our warehouse in Freiberg / Germany and can be picked up immediately. • You buy the system in "ACTUAL" condition from the warehouse Freiberg (EXW), Saxony, Germany, and advance payment. • The sale takes place as "used", EXW Freiberg, Saxony, Germany, to resellers or dealers despite full functionality without guarantee. • The installation and configuration of the system or the system components must be carried out by a specialist or technician authorized by the manufacturer!
used
GE UroView 2800 (urological x ray and fluoroscopy) with the following device components: Generator Jedi 00-883988 -01 _ 65 kW Tube Varian A-286 0.3/1.2 Image amplifier _ 00-884063-01 32.5 cm OEC workstation ESP Cine (trolley with double monitor) Sony Video Graphic Printer UP-960 CE Review-/double monitor (flat screen) complete and in good technical and cosmetic condition • The system was tested before dismantling of our employees on site. • It is located in our warehouse in Germany, packaged on pallets properly lashed down and wrapped in stretchfoil and can be picked up immediately. • You buy the equipments in "as in" condition from stock Freiberg (EXW), Saxony, Germany, and prepayment. • We are a used medical device dealer. We do not service or refurbish any of the items that we sell. All items are sold used and in as-is condition, unless otherwise stated. We do ...
used
GE Revolution XR/d with the following system components: Generator Jedi 80 tube MX 100 0.6/1.25 1 x detector 41cm 41cm separate mobile X-ray table company Zetta • The system was tested before dismantling of our employees on site. • It is located in our warehouse in Germany, packaged on pallets properly lashed down and wrapped in stretchfoil and can be picked up immediately. • You buy the equipment in "as in" condition from stock Freiberg (EXW), Saxony, Germany, and prepayment. • The sales take place as "used" to resellers or distributors, despite full functionality without warrenty/guarantee. • Installation and commissioning must only be performed by specialist staff with the appropriate qualifications.
used
BPG glass chromatography column., Inner diameter (mm): 200, Total volume (L): 16, Lower tapping: 1, Bottom stitching: 1, Top tapping: 2, Lower stitching: 1, Top stitching: 2, Top nozzle: 2
used
used
used
2x GE Frame 6B gas turbines # Technical Summary Equipment Details - Gas Turbines: Two GE MS 6001 B gas turbines paired with AEG generators (Type S7102/2). - Operation History: - Commissioning: 1981 - Gas-fired Operation: Until 2005, primarily for base load (~7000 hours/year). - Operational Hours in Combined Cycle: - GT21: ~167,000 hours, ~1130 starts - GT22: ~159,000 hours, ~1180 starts - Retrofitted: In 1996 with water injection for NOx reduction. - Conversion: In 2007 to peak load operation using heating oil (HEL) with new steel chimneys and upgraded control systems to ABB Procontrol 14. - Operational Hours in Peak Load: - GT21: ~130 hours, ~177 starts - GT22: ~150 hours, ~180 starts - Last Network Operation: 2015 - Last Oil Service: - GT21: October 2015 - GT22: September 2016 - Last Borescope Inspection: December 2016 - Defect: Heating oil transfer line issue in 2 ...