We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
used
SUB: FOR SALE... USED 2 SET BBC COMPLATE VTR 714E-32 T/C AT TURKEY... EMERGENCY HAVE A GOOD DAY. .WE HAVE USED 2 SET BBC COMPLATE VTR 714E-32 T/C AT TURKEY. AND READY TO LOAD ON TRUCK. OUR T/C SPECIFICATION AS BELOW MOY 1988 SERIAL NO.: X. 140769 / 140770 V 01113 R - H 04010 W 05206 E 03010 U 03 I 01800 T 01100 BOTH T/C ARE IN VERY GOOD CONDATION. IF YOU INTEREST PLS DO NEED HESITATE TO CONTACT WITH US. Capt. Ayhan Ugurlubay BEST of regards; Aliaga marine services E-mail: info@aliagamarine.com PHN/fax: + 90 232 618 03 85 Mobile: + 905556084850 ABC.aliagamarine.com TURKEY
used
Turbine Turbine mileage: 30,000 hours Counter-pressure turbine Manufacturer KKK Initial commissioning in 2002 Type: CFR5 G6a Power Max: 2500 kW Operating power: 2200 kW, Speed 23000 rpm, Fresh steam pressure: 65 bar, Fresh steam pressure temperature: 480 C, Evaporation pressure: 1-17 bar, Investments in 2002, Total steam forming station renewed from 63 bar to 2.5 bar in 2002, El. Generator Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA renewed, Complete measuring, control, control technology of the turbine renewed, steam turbine renewed With Energy Installed boiler power Boiler I Coal Steam generation: 20 t/h, 63 bar, 495 C Boiler II Coal Steam generation: 13 t/h, 34 bar, 425 C Boiler III: Combined burner for oil and gas, steam generation: 20 t/h, 17 bar, 285 C General overhaul of the entire plant from 2002 to 2004, steam generator renewed, automatic charcoal and ...
used
Turbine Operating Hours of Turbine: 30.000h Back-pressure turbine Manufacturer: Fa. KKK First Start-up: 2002 Type: CFR5 G6a Power Max: 2500 kW Operational efficiency: 2200 kW, Revolution number: 23000 U /min, Live steam pressure: 65 bar, Live steam pressure temperature: 480 °C, Evaporation pressure: 1-17 bar, Investments in the year 2002 , Entire steam transforming station from 63 bar to 2,5 bar in the year 2002 renewed, El. Generator Fa. Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA, renewed, Entire measuring -, governing and control of the turbine renewed, Steam turbine renewed with Energy Production Installed boiler efficiency: Boiler I , Hard coal, Steam generation: 20 t/h, 63 bar, 495 °C Boiler II , Hard coalr Steam generation: 13 t/h, 34 bar, 425 °C Boiler III: , Combination burner for oil and gas, Steam generation: 20 t/h, 17 bar, 285 °C General overh ...
used
Dear's Sale, T/C complate ABB TPS 57 Recon, Good condition Regards +905323642509 info@kscege
used
Dear's Sale, T/C complate ABB TPS 52 Recon, Good condition Regards +905323642509 info@kscege.com