We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
used
Mitsubishi Heavy Industries Ltd Type - SC1F ( Single Cylinder Single Flow ), Condensing Steam Turbine Power : 205.440MW HP Steam : 85 ata, 538 C LP Steam : 5.5 ata 193 C Steam Turbine Generator Model : MB-H Power - 241, 680 KVA Voltage - 16.5KV, 50 Hz
used
Kawasaki M7A-03D 7.2MW Natural Gas Turbine Complete CHP Generating Set Completely self-contained Kawasaki M7A-03D 7.2MW Gas Turbine and Generator package with Heat Recovery (Thermic Fluid Heater and HRSG Hot Water Generator) in acoustic enclosure. Runs parallel with grid. Island operation mode. Make and Model: Kawasaki TD80A Capacity: 7200kW Hrs: 10,000 V: 11,000 HZ: 50 Year: 2010 Fuel: Natural Gas Scope of supply: Gas Turbine GPB 80, M7A-03 DLE Single Gas Fuel, single shaft with DLE Combustor, reduction gear box, coupling with guard, Diaphragm Type, Generator (TD80A, 2011) Heat Recovery System - Thermic Fluid Heater, HRSG Hot Water Generator Acoustic Canopy with Lighting Control and Instrumentation Exhaust collector and/or diffuser, Gas Fuel system, Lube oil system, Inlet ducting, Inlet filtration system, Inlet silencer, Combustion system, Protection system ...
used
Ansaldo Condensing Steam Turbine Power: 9000 kW RPM: 7500 / 1500 Steam pressure: 40bara Steam temperature: 420 ºC Back Pressure: 0,08bar Number of extractions: 2 Number of stages: 8
used
BVI / ThyssenKrupp Condensing steam turbine MARC6-C03 2005 power generator with 135,000 operating hours, without steam condenser and AC generator. Inlet pressure 89 bar, outlet pressure 0.11 bar, 21,000 KWel x 1,500 rpm, Steam turbine BVI / ThyssenKrupp MARC6-C03 Manufacturer: BVI / ThyssenKrupp Model No.: MARC6-C03 Type: Steam Condensation Serial number: P-900078 Power [KW]: 23,545 Pressure Input [bar]: 89 Temperature Input [°C]: 520 Pressure output [bar]: 0.11 Year of Make: 2005 Hours: 135,000 Weight [kg]: 58,000 Dimensions LxWxH [cm]: 510x400x340
used
220 MW SGT-600 GT Complete Power Plant Duel Fuel Gas Turbine Power Plant Gensets 220.5 Megawatts in total 6 units available, 24.5 Mw each Speed 1,500 rpm, Generator Output 11 kV, Frequency 50 Hz Average running hours 70.000 hours Gas Turbine Power Plant operated predominately on natural gas with standby diesel fuel. Can be converted to alternative fuels as heavy fuel oil . Depends on the demand and needs of the customer. Phase I (5 units, commissioned on 2007) Phase II (4 units commissioned on 2012) Routine preventive maintenance was done for all units under OEM supervision, Emission ISO Standard at 15% O₂ Original Dry Low NOX ( DLE ) Combustion Chambers Inertial Filtration and Single Stage F9
used
Solar Gas turbine Taurus 65 SOLONOX The turbine and gear box is from 2022 and it only has 2000 running hours. The package is from year 2011. The condition is excellent and is ready to start working, in addition it included Solonox mode and fire extinction module. All the maintenance has been done by Turbomach official service. The equipment is already dismounted on our warehouse and ready to be load. It is available all the systems except the exhaust system that is optional. It is possible to have a visit and a inspection of the turbine. Also is available a boroscope of the turbine. YOM:2022 Power: 6300kWe Fuel: Natural Gas Working Hours: 2300 h Voltage: 6300V
new
SGT – 800 Gas Turbine Generator Set, 45,3 MW, with integral Local Equipment Room: Unit(s) to be supplied are unused, with zero running hours, never installed. Gas Turbine Package: Original year of assembly: 2022-2023 SGT 800 Gas Turbine Core Engine Original assembly location: Europe Never installed AC Generator: Original assembly location: SIEMENS Electrical Machines Original year of assembly: 2022-23 Package and core engine serial numbers will be confirmed upon placement of order The units` supporting documentation is available for review at any time with prior notice Scope of Supply: Driven unit AC Generator 11 kV 3 phase 50 / 60 Hz 4 pole 0.8 power factor Cylindrical pole brushless type Filter ventilated Class F insulation with class F total temperature rise Generator bearing temperature instrumentation Lubricating oil piping from gas turbine to driven unit ...
82MW ISO rated combined cycle power plant. The plant’s main equipment is composed of a Rolls Royce Trent 60 DLE Gas Turbine (also known as the SGT-A65), a Nooter/Eriksen HRSG, and a Siemens SST-300 Steam Turbine. These are below; 1. Rolls Royce USA, manufactured Trent 60 (SGT-A65) Gas Turbine Generator Set; · Manufactured in 2016, delivered in August 2017. Never used. · 65.9 MW(e) ISO · 43.8% Gross efficiency / 8,228 kJ/kWh Heat Rate · DLE Dry Low Emissions with ≤ 25 ppmvd at 15% O2 on fuel gas · Cold start to full power in under 10minutes · 50Hz, but easily convertible to 60Hz · Engine still preserved in original shipping container · An aero derivative gas turbine 2. HRSG is licensed by Nooter Eriksen USA; 3. Siemens Steam Turbine Generator SST-300 C2S/C160; · Manufactured in 2016 · Output 15.75MW ISO · Speed 7059 RPM · Adm ...
used
Pratt & Whitney gas turbine generator Model : FT8 Twin pac Power output : 48 MW Voltage : 11 KV Frequency : 50 Hz
used
GE Model : LM6000PA Power Output : 42 MWe ISO condition Voltage : 11KV Frequency : 50Hz Total 2 nos.
used
GE LM 2500 gas turbines 2 pcs available Power:24.000 Hp each Average working hours 1700 hours
used
Taurus 60 Turbine Generator Set Solar Taurus 60 T7301 Gas Turbine Engine Runnig hour 1165 hour after last Overhaul Output Power 5200 Kw Gearbox Solar Gear Unit 1165 hour after last Overhaul Type: Epicyclic Leroy Somer Generator 50 Hz
used
Kaplan turbine Escher Wass with standing shaft, used very good condition Gradient 7.00m-7.2 m Water volume 6000l/sec, power 500 hp, speed 375T/min
used
TAURUS 70 Gas Turbine Year Of Make: 2004 Total running hours: 58.000h Total hours since last overhaul 28.600h Turbine 15158 RPM 60 HZ / 15143 RPM 50 HZ Alternator 1500 RPM 50 HZ 7200 Kw at 9000 KVa 11000 Volts
new
Steam turbine Siemens SST400 Year: 2011 Disassembled and put in a storage. Very low working hours. Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Turbo gear unit Flender-Graffenstaden TX80/3 Transformer Siemens S10-40000/110 Condenser Full set of manual books No boilers, no voltage control cabinet (7) Steam turbine Siemens SST-400 Year: 2011 Never used and never installed. Still in original wooden crates. Packing lists. 7 sets available Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Control system Accessories Full set of manual books No boilers Price: on request
used
Emergency power gas turbine from 1977 with few running hours, without generator and controller. 1 available 456 KW x 1,500 1/min Manafacture: Garrett Model No.: ME831-800A Type: Gas turbine Serial Number: P-830005 Power [KW]: 456 Year of construction: 1977 Weight [kg]: 915 Dimensions LxWxH [cm]: 270x120x120
used
537 KW Tuthill Nadrowski back-pressure steam turbine C4. S-GIII from 2004, only turbine (was used as a pump). 1 available inlet pressure 90 bar, outlet pressure 18 bar, Price: € 19,500 each, plus VAT and FCA-free Manufacturer: TUTHILL Nadrowski Model: C4. S-G III Type: Steam Back Pressure Serial Number: 21004 Power [kW]: 537 Pressure inlet [bar]: 90 Pressure outlet [bar]: 18 Speed (rpm) 3.554 Year of construction: 2004 Weight [kg]: 2.440 Dimensions LxWxH [cm]: 370x138x174
used
Turbine Turbine operating hours: 30,000h Backpressure turbine Manufacturer: Kkk First start-up: 2002 Type: CFR5 G6a Power max: 2500 kW Operating efficiency: 2200 kW, Number of revolutions: 23000 rpm, Live steam pressure: 65 bar, Live steam pressure temperature: 480 C, Evaporation pressure: 1-17 bar, Investments in 2002 , Entire steam transformation station renewed from 63 bar to 2.5 bar in 2002, El. Generator Fa. Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA, renewed, complete measurement, control and control of the turbine renewed, steam turbine renewed with energy production General overhaul of the entire plant from 2002 to 2004, steam generator renewed, automatic corder and ash removal system renewed, water treatment plant renewed, complete instrumentation renewed, flue gas cleaning plant Lurgie renewed from 1991 - 2001 Mistakes excepted!
used
Turbogas Turbine GE5/1 5MW Natural gas for sale. Complete turbogas turbine plant with electric generator, recovery boiler and exchangers, dry cooler, diverter. Total Hours: 36,000 8,000 hours from the last overhaul. THERMAL POWER 9,0 MWt Saturated steam production 13,000 kg/h at 10BARg Voltage 11000 V Frequency 50 hZ Also available: - GE5/1 used turbine in nitrogen storage with 72,000 hours + 8,000 Hours after the last overhaul + one used generator Price: €240,000. - NEW GE5 Turbine Spare Parts (value 1 million) Price : €320,000. Available for sale from Gas Engine Exchange. Please check our complete range of equipment at gasengineexchange.
used
The power plant, based on a 5 MW gas turbine CENTRAX 501 KB7 is complete with all needed equipment, allowing a steam output of 20 tons per hour at 20 bar. From ZERO hours until the last working day all maintenance was performed by Centrax under full maintenance contract.
used
Complete 96 MWe gas fired black start/ peak load power station, consisting of 4 (four) GE Frame 5N Gas Turbine Sets 24 MW each. Each set consists of a: • Gasturbine • Generator • Diesel Engine • Main Gearbox • Auxiliary Gearbox • Speedtronic Mark II control system • Exhaust plenum • Air inlet filter house Dismantled With or without building. additional info on request.
used
1 x Steam turbine generator 3817 KW KKK Siemens CFR5 G6b 5,000 KWe x 1,500 rpm 50 Hz 6,300 V for sale in operational condition Turbine Manufacturer KKK Siemens Model CFR5 G6b Steam pressure fresh [bar] 64 Dampfdr. Ed. [bar] 8.5 Generator Manufacturer INDAR Model BZK-710-S/A-4 P Generator [KW] 5.000 Turn around. [per min] 1,500 Frequency [per sec] 50 Voltage [V] 6,300 Current [A] 458 Scope of delivery: The system has been completely dismantled and is complete including the control system. Technical documentation: available Spare parts / tools: not available The plant was dismantled in working order. Last major overhaul: unknown Sales are "as is" or after prior inspection by a company engaged by us on request
new
Description: Type : ÖLtransformator Version : Hermetic Make : CG POWER SYSTEMS Belgium NV B7ssq0vkzj Year of construction : 2012 Condition : New with 1 year warranty Rated power : 3500 KVA Medium voltage : 33 KV +- 2 x 5% Low voltage : 400 V Switching group : Dyn 5 Frequency : 50 Hz Cooling type : KNAN Total weight : 7750 Kg Oil weight : 1720 kg Synth. ESTER Length : 2400 mm Width : 900 mm Height : 2250 mm + 160mm cable flag Other sizes and voltages also available from 100 KVA to 3500 kva . All transformers are tested and ready for use and immediately available from our warehouse in 59557 LIPPSTADT . Nationwide delivery . For further questions available Mon to Sat. 8 a.m. to 10 p.m.
750 MW each, UNUSED Gas Based Complete Combined Cycle Power Plants 2 units available Technical Specifications: The Project Details: 1. EACH module has two Gas turbines GE 9FA.03 (DLN2+) and one Steam turbine GE D11. Each GT exhaust is directed to the triple pressure unfired, natural circulation horizontal, type CMI USA HRSG. This configuration helps turndown operation of station up to 45%. 2. The Station is based on robust design of GE Gas Turbine with high efficiency DLN2+ Dry low Nox system, each GT is site rated for an output of 235 MW and the triple pressure reheat GE D11 Steam Turbine with downstream Exhaust, is site rated at 266 MW. The HRSG is a Triple pressure, Natural circulation, Horizontal design type with Deaerator atop the LP drum. Thus Net Combined cycle efficiency at Site condition is approx 57% on LHV basis. The inherent design of the gas turbine reduced the N ...
used
The combined cycle plant consists of a gas turbine, waste heat recovery boiler, steamturbine and a generator, mounted in a single shaft configuration. The capacity of the installation is 53 MW • The prime mover of the installation is an aero derivative General Electric LM6000-PB-DLE. 40 MW - 30,000 hours remaining till next major overhaul - Running hours 74.100 hours , start 3356 - Next overhaul in 5000 hours(hot gas path) - Next major overhaul: in 30.000 hours • The Steam Turbine is a SIEMENS ENK40/53-3, with a capacity of 13 MWe. Dismantled, stored and ready for transport.
used
TO WHOM IT MAY CONCERN; WE VE GENUINE 3 PCS MAN NR 34 / S 114. COMPLETE EXHAUST GAS TURBOCHARGER WITH SILENCER AT AT OUR STOCK. IT IS OVERHAULED & TESTED ON TRIAL ENGINE OPERATION . PLS FIND SPECT AT BELOW. TYPE NR34 / S 114 SERIAL NO SMM0965 t max . 650 C n max 26300 1/min YOB 2012 -09 . MADE IN MAN ENTPACO IF YOU VE ANY FURTHER QUESTIONS PLS DO NOT HESITATE TO CONTACT WITH US . Capt. Ayhan Ugurluba BEST REGARDS; Aliaga marine services E mail: info/aliagamarine.com PHN/fax: +90 232 618 03 90 Mobile: + 905556084850 aliagamarine.com TURKEY
used
HHI-BBC Turbine Housing RPM - 17400 Only the turbine hull.
used
MBARBECOL turbine flap PN-5478 MAN 28/32 engine Just the turbine hull.
new
TO WHOMIT MAY CONCERN ; WE VE NEW UNUSED COMPLETE ROTOR AND SHAFT ABB VTR 304 - P11 AT OUR STOCK ADDATIONALY WE VE RECON COMPLETE ROTOR AND SHAFT ABB VTR 304 - P11 COMPRESSOR SIDE AND TURBINE SIDE ARE NEW .. THIS ROTORS ARE FIT FOR BELOW EXHAUST TURBO CHARGER TYPE TYPE ABB VTR 304 P 11 HT 439312 n max 467 n bmax 443 t max 680 t bmax 650 HZTL 428765 P3 EX STOCK. IF YOU VE ANY FURTHER QUESTIONS PLS DO NOT HESITATE TO CONTACT WITH US Capt. Ayhan Ugurluba With Kind Regards ; Aliaga Marine Services E mail: info/aliagamarine.com Phn/Fax:+90 232 618 03 90 Mobile: +905556084850 aliagamarine.com TURKEY
used
1 piece ABB TPL 77-B12 turbocharger complete available New In our stock in Istanbul Please contact: info@fin-marine