We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
MAN 32.322 chassis, year of construction 1993, 242,000 km, pump Putzmeister 17.50 m with radio remote control, good condition ...
Max. grain size: 32mm, max. delivery pressure: 75bar, max. rotational speed: 1500/min, max. hydraulic pressure: 300bar, connected load: 45kW, weight: 2.5t, operational hours counter: 2990h, with single-axle chassis, four support legs and cable remote control. ...
ID2872 Putzmeister BSA1409 D5 year/Year of construction 2020 approx. 200 hours/hours Trailer concrete pump Diesel, ready for use Trailer Concrete Pump Diesel, Ready for Use ...
ID2652 Putzmeister HM25 AZ 24/100 year approx. 1995 approx. 1210 hours/hours Mobile Concrete pump Putzmeister HM25 AZ 24/100 on tracks (25 t Atlas undercarriage), approx. 24 m boom, radio remote control, wired remote control, approx. 60 -70 cbm pump capacity, Iveco/Fiat 6 cylinder suction engine Mobile concrete pump Putzmeister HM25 AZ 24/100 on tracked suspension (25 t Atlas undercarriage), approx. 24 m design, radio remote control, wired remote control, approx. 60 -70 cbm pumping capacity, Iveco/Fiat 6 cylinder naturally aspirated engine
Incl.: Hydraulic power unit Putzmeister HA 55, built in 2001 Switchboard Dismantling will take place in September/October 2024 Subject to prior sale - errors possible Internal Reference Number: D-1178 ...
used pipe points cleaning master / atlas type 02V92 construction year: In 1993 nominal width: DN200 nominal pressure: PN100 manual: no ...
used injection nozzle cleaning master construction year: In 1993 nominal width: DN200 nominal pressure: PN100 manual: no two machines same to construction exist ...
Machine number: 8964 ...
Material: stainless steel Very good condition. You can also get the entire system with all components. Write us below! ...
From small through medium to big concrete batching plants, Prometal presents the most efficient ways of production of concrete with great results of high-quality concrete. Our customers can choose between 15 cubic meters per hour to 120 cubic meters per hour concrete batching plants. Long-lasting structures and stable design provides our customers with long term profitable investment with no regrets. The aggregate bunker is designed and manufactured to operate under heavy working conditions for a long time. There are 2 electro-pneumatically controlled discharge gates, which provide easiness and choice in the discharge together with suitable elevation. Aggregates are weighed by ...