We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
We are pleased to present our complete commercial and technical offer for an unused 2 × 750 MW Combined Cycle Gas Turbine (CCGT) Power Plant, based on GE Frame 9FA technology, supplied, installed, but not commissioned. The plant equipment is available as a complete package, including major equipment, auxiliaries, and Balance of Plant (BOP). 1. Plant Configuration Overview Total Configuration: • 2 × GE Frame 9FA Gas Turbines • 2 × CMI Triple Pressure HRSG • 1 × GE Steam Turbine • Combined Cycle Output: ~750 MW per block Status: • Installed / partially installed • Not commissioned • Units have never been fired or operated 2. Gas Turbine Island Gas Turbines • Quantity: 2 Units • Manufacturer: GE • Model: Frame 9FA +e DLN2+ • Fuel: Dual Fuel • Frequency: 50 Hz • Site Rated Output: 241,000 kW per unit • Year of Manufacture / De ...
We are pleased to present our complete commercial and technical offer for an unused 2 × 750 MW Combined Cycle Gas Turbine (CCGT) Power Plant, based on GE Frame 9FA technology, supplied, installed, but not commissioned. The plant equipment is available as a complete package, including major equipment, auxiliaries, and Balance of Plant (BOP). 1. Plant Configuration Overview Total Configuration: • 2 × GE Frame 9FA Gas Turbines • 2 × CMI Triple Pressure HRSG • 1 × GE Steam Turbine • Combined Cycle Output: ~750 MW per block Status: • Installed / partially installed • Not commissioned • Units have never been fired or operated 2. Gas Turbine Island Gas Turbines • Quantity: 2 Units • Manufacturer: GE • Model: Frame 9FA +e DLN2+ • Fuel: Dual Fuel • Frequency: 50 Hz • Site Rated Output: 241,000 kW per unit • Year of Manufacture / De ...
новий
Ми раді представити нашу повну комерційну та технічну пропозицію на невикористану 2 × 750 МВт комбіновану газотурбінну електростанцію (CCGT), засновану на технології GE Frame 9FA, поставлену та встановлену, але не введену в експлуатацію. Обладнання заводу доступне у повному комплекті, включаючи основне обладнання, допоміжні пристрої та баланс станції (BOP). 1. Огляд конфігурації заводу Загальна конфігурація: • 2 газотурбіни GE Frame 9FA × • 2 × CMI Потрійний тиск HRSG • 1 × парова турбіна GE • Вихідна Ð ...