weight max. in kg: 500 kg
arm length: 4000 mm
height: 3425
Unterkante Ausleger
total column height: 4215 mm
swivelling
range: 270 Grad
Total weight, approx.: 550
kg
Description:
- Trolley power supply
- Trailing cable,
cable slack approx. 800 mm
- Operation from the hallway using a
pendant control
including:
- ABUS electric chain
hoist
- Chain hoist type GM 2 500.4-2, 2-leg
- painted i color
RAL 5017 traffic blue
- load capacity 500 kg
- hook path 3000
mm
- highest hook position 2965 mm
- Calculation basis FEM
9.901
- Drive group 2m / M5
- Lifting, 2-stage (pole
switchable) 1/4 m / min
- Lifting power 0.09 / 0.35 kW
- duty
cycle 60% ED
- Circuits 360 c / h
Overload
protection
The crane system complies with the requirements of the
Machinery Directive 2006/
42 / EC
as well as the currently
valid UV regulations DGUV regulation 52
(formerly BGV
D6).
included :
- Anchor rods L200 (set) size LS
200
- Consists of 8 pieces M27 mm x 800 mm with 1 steel template
(500/8)
- for fixing the foundation, including accessories for
grouting
There is an assembly gap between the column base to
align the slewing crane
and building floor to be provided. The
assembly gap is after approx. 4 weeks
Crane operation to be poured
under by the customer.
Fig. Shows a similar crane
system
The data for this ad was created with
ModulMWS - the software solution of LogoTech oHG.