Battery Production Facility
Manufacturer: Aumann
Year: 2016
Condition: Used – good working condition
1) Banding System for Battery Cells NMC/LTO
Technical Data: 20,000 battery modules NMC (14 cells each) per year,
cycle time 22.2 sec/cell
Includes:
- Control cabinet with Siemens control system
- Modular protective design (Module 2)
- Banding station A1023 for NMC (Samsung) and LTO (Toshiba)
- Cleaning system in film feed area
- Tool set for NMC (14 cells)
2) Assembly System for Battery Modules NMC/LTO
Technical Data: 20,000 battery modules NMC (14 cells each) per year,
cycle time 31 sec/module
Includes:
- Control cabinet with Siemens control system
- U51258834 Baseplate assembly and module housing
- Cleaning and testing stations
- Electrical inspection (DMC scan + NIO selection)
- Housing assembly, end-of-line testing
- Laser cell welding system with shielding
- Tool sets for NMC (14 cells) and LTO (36 cells)
Find more here - /
Contact us at -