Overview This filling line for returnable glass was installed in
2019 and essentially consists of a bottle washer, rinser/filler and
capper block and a labeling system with laser printer. The bottling
line is vacant as the previous owner is closing the brewery due to
retirement. The bottling process ran smoothly until the end. The
equipment is still installed and connected and can be viewed in person
at any time. Technical details Capacity: max. 1,500 bph (1,000
bph were actually run) Bottled product: Beer Included formats:
0.33l longneck, 0.5l NRW Closure: Crown cap Scope of delivery
Bottle washer | SEN | 1989 (overhauled and installed in 2020)
Isobaric filler block | Shandong Yuesheng | 2019 Rinsing
positions: 14 Filling positions: 12 Capping positions: 5
With pre-evacuation Counter-pressure filler incl. 2 formats 0.33
longneck 0.5 NRW Dry tunnel | Shandong Yuesheng | 2019 Labeler
incl. laser printer Collecting table