Bag Filter Plant and Settling Chamber

The Deduster utilizes a bag filter system to effectively extract and filter fumes and dust generated during Electric Arc Furnace and Ladle Furnace operations. The Quencher acts as the primary suction and cooling train for the Consteel® preheating tunnel, using a settling chamber and water spray system to rapidly lower hot gas temperatures.


Technical Details
‍

‍

Deduster (Fume Extraction / Bag Filter Plant)
‍

Manufacturer: Hascon Engineering S.p.A., Legnano (MI), Italy

Year of Manufacture / Reference: 2007

Type / Scope: Fume extraction and dedusting plant (bag filter) for the 60 t/h Electric Arc Furnace with Consteel, plus Ladle Furnace

Key technical data:

Bag filter type AJ-D-9(4×16)-3M/192, flow rate 1,000,000 Em³/h, 130°C max, 18 compartments, 3,456 bags, ≈12,150 m² total filtering surface
Main duct (filter inlet): Ø3,500 mm, 706,964 Nm³/h at 48°C
2× centrifugal exhaust fans, type XB 250, 500,000 Em³/h each, 1,800 kW installed power each, 6 kV motors
Stack: Ø5,100 mm, 37 m high, continuous dust emission monitoring (SICK-MAIHAK FW100 probe)
Stack dust emission limit: < 5 mg/Nm³ (dry gas)
Design air volumes: Consteel outlet 73,000 Nm³/h 1,050°C; Ladle Furnace 25,000 Nm³/h 130°C; canopy hood 300,000–550,000 Nm³/h 60°C (tapping)
Control system: Siemens S7-300 based PLC with SCADA/HMI
‍

‍

Quencher (Settling Chamber)
‍

Manufacturer: Techint/Tenova

Year of Manufacture / Reference: 2005

Type / Scope: Primary fume suction and cooling train from the Consteel® preheating tunnel: suction pipe → settling chamber → gas cooling (spray system)

Key technical data:

Suction pipe from Consteel®: water-cooled, pipe-to-pipe construction, Ø≈1,800 mm, length ≈8 m
Settling chamber: concrete construction, refractory lined; settles coarse dust and completes CO → CO₂ combustion where needed
Wide water-cooled door for coarse dust evacuation by front-end loader; fitted with explosion relief doors
Gas cooling: spray-nozzle system (water + compressed air); water requirement 20 m³/h; compressed air ≈1,300 Nm³/h
Cooling unit includes water pumping station with two pumps (one duty, one stand-by)

加载视频时,数据将传输至 YouTube。

播放视频

将产品分享到Facebook:

询价

是否为设备经销商?

请选择汇款

发布求购需求?

复制给您?

Save input data

Bag Filter Plant and Settling Chamber

The Deduster utilizes a bag filter system to effectively extract and filter fumes and dust generated during Electric Arc Furnace and Ladle Furnace operations. The Quencher acts as the primary suction and cooling train for the Consteel® preheating tunnel, using a settling chamber and water spray system to rapidly lower hot gas temperatures.


Technical Details
‍

‍

Deduster (Fume Extraction / Bag Filter Plant)
‍

Manufacturer: Hascon Engineering S.p.A., Legnano (MI), Italy

Year of Manufacture / Reference: 2007

Type / Scope: Fume extraction and dedusting plant (bag filter) for the 60 t/h Electric Arc Furnace with Consteel, plus Ladle Furnace

Key technical data:

Bag filter type AJ-D-9(4×16)-3M/192, flow rate 1,000,000 Em³/h, 130°C max, 18 compartments, 3,456 bags, ≈12,150 m² total filtering surface
Main duct (filter inlet): Ø3,500 mm, 706,964 Nm³/h at 48°C
2× centrifugal exhaust fans, type XB 250, 500,000 Em³/h each, 1,800 kW installed power each, 6 kV motors
Stack: Ø5,100 mm, 37 m high, continuous dust emission monitoring (SICK-MAIHAK FW100 probe)
Stack dust emission limit: < 5 mg/Nm³ (dry gas)
Design air volumes: Consteel outlet 73,000 Nm³/h 1,050°C; Ladle Furnace 25,000 Nm³/h 130°C; canopy hood 300,000–550,000 Nm³/h 60°C (tapping)
Control system: Siemens S7-300 based PLC with SCADA/HMI
‍

‍

Quencher (Settling Chamber)
‍

Manufacturer: Techint/Tenova

Year of Manufacture / Reference: 2005

Type / Scope: Primary fume suction and cooling train from the Consteel® preheating tunnel: suction pipe → settling chamber → gas cooling (spray system)

Key technical data:

Suction pipe from Consteel®: water-cooled, pipe-to-pipe construction, Ø≈1,800 mm, length ≈8 m
Settling chamber: concrete construction, refractory lined; settles coarse dust and completes CO → CO₂ combustion where needed
Wide water-cooled door for coarse dust evacuation by front-end loader; fitted with explosion relief doors
Gas cooling: spray-nozzle system (water + compressed air); water requirement 20 m³/h; compressed air ≈1,300 Nm³/h
Cooling unit includes water pumping station with two pumps (one duty, one stand-by)
seller offer No. resale 170263572

加载视频时,数据将传输至 YouTube。

播放视频

将产品分享到Facebook:
认证
经销商

卖家

KRUDO Industrial

Mr Martin Kolodziejczyk
1114A Amsterdam
Netherlands

RESALE 会员 开始年份 2021

  • 机器设备列表 (57)

询价

是否为设备经销商?

请选择汇款

发布求购需求?

(发给所有此类机械经销商)

复制给您?

(您的询价副本将发送到您的邮箱)

Save input data

(Save input data for further inquiries)

加入备选清单