This system hall from the manufacturer HALTEC, type Stahlflex SH10 12 × 48 × 6.2 m, was built in 2006 as a storage and picking hall and is ready for dismantling and reuse. Eleven frames made of IPE 220 with drawstring span 12 m without internal supports. The wall and roof consist of sandwich panels, a continuous skylight and three smoke and heat vents provide daylight and ventilation. The approved factory drawings from 2006 and an as-built plan from 2017 are available. The hall will be vacated in January 2027 and dismantled in February 2027; high-speed doors, lighting and office installation are part of the scope of delivery.