We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
Biomass Plant, 5 MWel, 50 Hz, yoc 2002, in operation Boiler • Technical data: - Fuel tank capacity: approx. 1 .300 m 3 - Exhaust gas volume 29,000 Nm3/h - Average combustion temperature of 900°C (850 for 2 s.) - Thermal power of the furnace 13 MW - 2 add. Burners 5 MW each - Average calorific value Hu 12,500 kJ/kg - Throughput capacity 3,991 kg/h - Boiler working pressure 41 bar - Superheated steam temperature 420°C - designed amount of steam 14 t/h - Fuels: RDF, wood chips, straw, remains of chipboard, choiceed waste Hours of operation of the entire plant appr. 120,000 hours Steam turbine - TWIN steam turbine KKK, type: CFR 3 / AFA 6 GTA ...
Qty. 1 Second-hand power plant including boiler (BFB – boiler: bubbling fluidized bed) Mfc.: Foster Wheeler, Siemens, Raumaster, YIT Corporation, Honeywell, Built: 2001, 2002, 2006, 2009 Revision: 2009 Insulation removed in 2018 BFB Boiler – 88 MW Steam turbine – 22.5 MW Main Steam Cycle BFB boiler K7 – Some parts removed and storaged indoor at the paper mill area – Boiler is made electrically safe (cables cut) – Dry conservation ongoing since 2014 (tubes filled with nitrogen, dry air circulation) – Steam Turbine VP4 (in storage) Generator (in storage) Power Plant – Function Primary function is to produce steam for the Paper Mill reliable and economically S ...
3 MW Siemens Steam Turbine SST-110 TWIN AFA 46 K Year: 2010 Hours: 5,200 Capacity: 3,224 kW Volts: 400 HZ: 50 Condition: Very Good Scope of Supply: Complete Turbine Power Station Turbine and alternator Control Panel Condensor Cooling Towers Spilling Unit Switchgear Synchronisation panel Transformer Piping / wiring / pumps Boiler not included Inspected in Very Good Condition. Dismantled and loaded to your transport .
RECON Standard size part number: 1230 2056 = 1507 7534 incl. counterweights ---------------------------------------------------------------------- ---------- Please note: we also have other various RECON parts of different manufaturers / types in stock. We are pleased to provide you with our current stock list. ---------------------------------------------------------------------- ---------- If you have any further questions do not hesitate to contact us
Francis turbine, used 40 kW, 3 m³, height 2m Speed 106 / 375 RPM 69 HP, built in 1963 Generator Schorch GmbH Type KT 7315 s FB01 Z-Z 50 Hz, 512U/min 55kW ...
Kaplan turbine used 50 kW, 3 m³, height 2m Speed 150 / 460 RPM 70 HP, built in 1963 Generator Schorch GmbH Type KT7280S - DB05 Z-Z 50 Hz, 770 RPM 55kW ...
HHI-BBC Turbine Housing RPM - 17400 Only the turbine hull. ...
Used 3-station turbine packing machine. Dose range 5-50 kg, has a pickup conveyor and a bag-forming conveyor. YOM 90's. ...
Hydroelectric power station - Power 790 kW composed of: 1 Turbine Pelton / Effective gradient 223m / Water volume 400 l/s / 1 piece generator 1 shut-off device 1 hydraulic power unit 1 piece transformer ...
RECON Standard size Part number 1213 5136 incl. counterweights ---------------------------------------------------------------------- ---------- Please note: we also have other various RECON parts of different manufaturers / types in stock. We are pleased to provide you with our current stock list. ---------------------------------------------------------------------- ---------- If you have any further questions do not hesitate to contact us