We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
Used 3-station turbine packing machine. Dose range 5-50 kg, has a pickup conveyor and a bag-forming conveyor. YOM 90's. ...
Francis turbine, used 40 kW, 3 m³, height 2m Speed 106 / 375 RPM 69 HP, built in 1963 Generator Schorch GmbH Type KT 7315 s FB01 Z-Z 50 Hz, 512U/min 55kW ...
Kaplan turbine used 50 kW, 3 m³, height 2m Speed 150 / 460 RPM 70 HP, built in 1963 Generator Schorch GmbH Type KT7280S - DB05 Z-Z 50 Hz, 770 RPM 55kW ...
Qty. 1 Second-hand power plant including boiler (BFB – boiler: bubbling fluidized bed) Mfc.: Foster Wheeler, Siemens, Raumaster, YIT Corporation, Honeywell, Built: 2001, 2002, 2006, 2009 Revision: 2009 Insulation removed in 2018 BFB Boiler – 88 MW Steam turbine – 22.5 MW Main Steam Cycle BFB boiler K7 – Some parts removed and storaged indoor at the paper mill area – Boiler is made electrically safe (cables cut) – Dry conservation ongoing since 2014 (tubes filled with nitrogen, dry air circulation) – Steam Turbine VP4 (in storage) Generator (in storage) Power Plant – Function Primary function is to produce steam for the Paper Mill reliable and economically S ...
HHI-BBC Turbine Housing RPM - 17400 Only the turbine hull. ...
Hydroelectric power station - Power 790 kW composed of: 1 Turbine Pelton / Effective gradient 223m / Water volume 400 l/s / 1 piece generator 1 shut-off device 1 hydraulic power unit 1 piece transformer ...
Biomass Plant, 5 MWel, 50 Hz, yoc 2002, in operation Boiler • Technical data: - Fuel tank capacity: approx. 1 .300 m 3 - Exhaust gas volume 29,000 Nm3/h - Average combustion temperature of 900°C (850 for 2 s.) - Thermal power of the furnace 13 MW - 2 add. Burners 5 MW each - Average calorific value Hu 12,500 kJ/kg - Throughput capacity 3,991 kg/h - Boiler working pressure 41 bar - Superheated steam temperature 420°C - designed amount of steam 14 t/h - Fuels: RDF, wood chips, straw, remains of chipboard, choiceed waste Hours of operation of the entire plant appr. 120,000 hours Steam turbine - TWIN steam turbine KKK, type: CFR 3 / AFA 6 GTA ...
3 MW Siemens Steam Turbine SST-110 TWIN AFA 46 K Year: 2010 Hours: 5,200 Capacity: 3,224 kW Volts: 400 HZ: 50 Condition: Very Good Scope of Supply: Complete Turbine Power Station Turbine and alternator Control Panel Condensor Cooling Towers Spilling Unit Switchgear Synchronisation panel Transformer Piping / wiring / pumps Boiler not included Inspected in Very Good Condition. Dismantled and loaded to your transport .
entry dimensions: 1000 mm wide / 4000 mm high length of chamber: 3500 mm 4 turbines, 5,5 kW each material speed: 63 m/sec 150 kg/min abrasive material per turbine max workpiece weight: 500 kg electric power: 45 kW Kind off: shot blasting unit Turbines: 4 turbines - 5,5 kW each ...
Geroldinger feeding station with electric heating and cell feeder. ...